Have-Done-List

While I was working on yesterday's post, I was thinking of all the things we had done in each room. Even though it hasn't been that long ago, I had forgotten some things.(too many things happening at once!) So for future reference and to remind me just how far the little house has come I am going to make a Have-Done-List.
 
 
 
Entry
Tore up linoleum floor.
Steamed and scraped tar paper off of floor
Re-wired switch and outlet
Added ceiling light
Patched holes from electrical work
Primed and painted walls, ceiling and trim
Sanded, stained and shellacked floor
Replaced quarter round trim
 
Living/Dining Room
Pulled a million and one staples out of the floor
Pulled up carpet tack strips
Re-wired switches and outlets
Added ceiling light in the living room
Moved ceiling light to center of dining room
Patched holes cut for electrical work
Primed and painted walls and trim
Sanded, stained and shellacked floor 
Replaced quarter round trim
 
Kitchen
Pulled up carpet
Removed cabinets so we could pull up wood floor
Pulled up wood floor
Added new joist to fix sagging floor
Installed cement board and tile on floor
Patched walls behind cupboards
Primed walls (no paint yet!)
Primed and painted cabinets
Re-installed cabinets
Replaced counter tops
Re-wired outlets and switches
 
First Bedroom
Pulled up carpet
Removed staples and carpet tack strips
Rewired switches and outlets
Added ceiling light
Patched walls where plumbing had been plastered in and old wall light had been
Primed and painted walls, ceiling, trim and doors
Shellacked floors
Replaced quarter round trim
 
Second Bedroom
Pulled up carpet
Removed staples and carpet tack strips
Rewired switches and outlets
Added ceiling light
Patched holes from electrical exploration
Primed and painted walls, ceiling, trim and doors
Shellacked floors
Replaced quarter round trim
 
Bathroom
Removed all fixtures, walls, floor and ceiling
Re-wired switches and outlet
Added exhaust fan
Install new window 4" to right of old one
Frame in bathtub and new closet
Cement board the floor
Install new tub
Replace plumbing
Insulate walls
Drywall walls
Plaster walls
Tile floor and tub walls
Prime and paint walls and ceiling
 
Front Stairs and Landing
Ripped up carpet
Pulled out staples
Re-wired switch and light
Painted and primed walls and ceiling
Painted kick plates on stairs
Shellacked steps and landing
 
Upstairs Bedroom
Ripped out carpet
Pulled up staples and carpet tack strips
Switched door from out-swinging to in-swinging
Tore out outlets that were on the outside of the wall
Added new outlets inside wall
Re-wired switch and light
Primed and painted walls and ceiling, trim and doors.
Shellacked floor
 
Sewing Room
Pulled up staples
Re-wired outlet
Primed and painted walls and ceiling, trim, windows and doors
Scraped paint off corner of floor
Shellacked floor
 

Porch
Pulled up carpet
Scraped old glue and paint off floor
Primed and painted floor
Washed walls
Painted trim